(Jun
- 2011)
A. Process
B. Manufacturing
C. Method
D. Tools
Answer:
- B
2. What
is the first stage in program development? (Jun – 2011)
A. Specification
and design
B. System
Analysis
C. Testing
D. None
of the above
Answer:
- B
3. By
means of a data flow diagram, the analyst can detect (Jun – 2011)
A. Task
duplication
B. Unnecessary
delays
C. Task
overlapping
D. All
of the above
Answer:
- D
4. Which
of these are the 5 generic software engineering framework activities?(Jun – 2011)
A. Communication,
planning, modeling, construction, deployment
B. Communication,
risk management, measurement, production, reviewing
C. Analysis,
designing, programming, Debugging, maintenance
D. Analysis,
planning, designing, programming, testing
Answer:
- A
5. Many
causes of the software crisis can be traced to mythology based on(Jun – 2011)
A. Management
Myths
B. Customer
Myths
C. Practitioner
Myths
D. All
of the above
Answer:
- D
6.
For a data entry project for office
staff who have never used computers before (user interface and
user-friendliness are extremely important), one will use (Dec – 2011)
A. Spiral
model
B. Component
based model
C. Prototyping
D. Waterfall
model
Answer:
- C
2.
An SRS (Dec –
2011)
A. Establishes
the basis for agreement between client and the supplier
B. Provides
a reference for validation of the final product.
C. Is
a prerequisite to high quality software?
D. All
of the above.
Answer:
- D
7.
McCabe’s cyclomatic metric V(G) of
a graph G with n vertices, e edges and p connected component is (Dec – 2011)
A. E
B. (B)
n
C. (C)
e – n + p
D. (D)
e – n + 2p
Answer:
- C
8.
Emergency fixes known as patches
are result of (Dec – 2011)
A. Adaptive
maintenance
B. perfective
maintenance
C. Corrective
maintenance
D. None
of the above
Answer:
- C
9.
Design recovery from source code is
done during (Dec – 2011)
A. Reverse
engineering
B. Re-engineering
C. Reuse
D. all
of the above
Answer:
- D
10. Following
is used to demonstrate that the new release of software still performs the old
one did by rerunning the old tests: (Dec – 2011)
A. Functional
testing
B. Path
testing
C. Stress
testing
D. Regression
testing
Answer:
- D