(Jun
- 2011)
A.     Process
B.     Manufacturing
C.     Method
D.     Tools
Answer:
- B
2.      What
is the first stage in program development? (Jun – 2011)
A.     Specification
and design
B.     System
Analysis
C.     Testing
D.     None
of the above
Answer:
- B
3.      By
means of a data flow diagram, the analyst can detect            (Jun – 2011)
A.     Task
duplication
B.     Unnecessary
delays
C.     Task
overlapping
D.     All
of the above
Answer:
- D
4.      Which
of these are the 5 generic software engineering framework activities?(Jun – 2011)
A.     Communication,
planning, modeling, construction, deployment
B.     Communication,
risk management, measurement, production, reviewing
C.     Analysis,
designing, programming, Debugging, maintenance
D.     Analysis,
planning, designing, programming, testing
Answer:
- A
5.      Many
causes of the software crisis can be traced to mythology based on(Jun – 2011)
A.     Management
Myths
B.     Customer
Myths
C.     Practitioner
Myths
D.     All
of the above
Answer:
- D
6.     
For a data entry project for office
staff who have never used computers before (user interface and
user-friendliness are extremely important), one will use    (Dec – 2011)
A.     Spiral
model
B.     Component
based model
C.     Prototyping
D.     Waterfall
model
Answer:
- C
2.     
An SRS                        (Dec –
2011)
A.     Establishes
the basis for agreement between client and the supplier
B.     Provides
a reference for validation of the final product.
C.     Is
a prerequisite to high quality software?
D.     All
of the above.
Answer:
- D
7.     
McCabe’s cyclomatic metric V(G) of
a graph G with n vertices, e edges and p connected component is             (Dec – 2011)
A.     E
B.     (B)
n
C.     (C)
e – n + p
D.     (D)
e – n + 2p
Answer:
- C
8.     
Emergency fixes known as patches
are result of                         (Dec – 2011)
A.     Adaptive
maintenance
B.     perfective
maintenance
C.     Corrective
maintenance
D.     None
of the above
Answer:
- C
9.     
Design recovery from source code is
done during                      (Dec – 2011)
A.     Reverse
engineering   
B.     Re-engineering
C.     Reuse   
D.     all
of the above
Answer:
- D
10.  Following
is used to demonstrate that the new release of software still performs the old
one did by rerunning the old tests:                 (Dec – 2011)
A.     Functional
testing
B.     Path
testing
C.     Stress
testing   
D.     Regression
testing
Answer:
- D
 

 
No comments:
Post a Comment